King post/soldier piles and lagging walls are a cost effective system of temporary or permanent retaining wall using beams and pre-cast concrete panels.
Common uses
Most retention applications and heights in different ground conditions including rock
Often used for basements, embankment retention and flood defence walls
Process
King post walls are a simple and quick installation method. They comprise drilling a hole with a high powered, continuous flight auger (CFA) piling rig, filling it with concrete, then installing an H beam. This allows concrete pre-stressed panels or sleepers to be inserted between the webs of the H sections.
Excavation then results in the finished embedded retaining wall.
Advantages
Quick to install
Cost effective compared to sheet and concrete piled walls